Restoration & Private Works
Public Road Activity, Restoration & Private Works
All fees are inclusive of GST where applicable
Public Road Activity
Description | Total Fee | GST |
---|---|---|
All establishment costs associated with items such as traffic and pedestrian management, service location and Dial Before You Dig, environmental measures, temporary works to make site safe, significant earthworks or topsoil and assessing or obtaining Road Occupancy Licences will be charged at cost in addition to the nominated Fees and Charges. Applies to all works. | Price on Application | N |
Note: Application fees will not be refunded where assessment has been completed or approval issued. An administration fee will apply for cancellations where an assessment has been partially completed. | $87.50 | Y |
(i) Driveway Crossings - Non Standard Driveway | $474.00 | N |
Note: Includes 1st inspection - additional charges apply for re-inspections. If multiple driveways are proposed, additional inspection fee for each additional driveway is added to the application fee. Refunded fee for partial assessment is based on cost of works undertaken to date. | ||
(ii) Driveway Crossings - Standard Driveway | $356.00 | N |
Note: Includes 1st inspection - additional charges apply for re-inspections see (iv) | ||
(iii) Driveway Crossings - Commercial/Industrial | $618.00 | N |
Note: Includes 1st inspection - additional charges apply for re-inspections see (iv) | ||
(iv) Additional Formwork/Final Inspections/Reinspection | $165.00 | N |
(v) Reissuing of unexpired vehicular footpath crossing levels and specification | $48.50 | N |
(vi) Vehicular Gutter Crossing | $237.00 | N |
(vii) Street Alignment Levels | $191.00 | N |
(viii) Road Opening Permit (public utility and new service connections) | $152.00 | N |
Note: For connections associated with new building work, 1 permit per dwelling/building is applicable | ||
Non-standard Road Opening Permit | $448.00 | N |
Public Infrastructure Damage Inspection Fee
Description | Total Fee | GST |
---|---|---|
(a) In ground pool | $227.00 | N |
(b) Dwelling additions (> $50,000) | $227.00 | N |
(c) Dwellings | $299.00 | N |
(d) Commercial/Industrial (new work - excluding shop fit out) | $299.00 | N |
Road Restoration Fees
Description | Total Fee | GST |
---|---|---|
All establishment costs associated with items such as traffic and pedestrian management, service location and Dial Before You Dig, environmental measures, temporary works to make site safe, significant earthworks or topsoil and assessing or obtaining Road Occupancy Licences will be charged at cost in addition to the nominated Fees and Charges. Applies to all works. | Price on Application | N |
Roads: (per sqm) | ||
Asphalt concrete 100mm thickness | ||
Areas up to 5m2 | $397.00 | N |
Areas between 5m2 and up to 10m2 | $376.00 | N |
Areas between 10m2 and up to 20m2 | $325.00 | N |
Areas above 20m2 | $314.00 | N |
Asphalt concrete (AC) road surfaces greater than 100mm thickness | Price on Application | N |
DGB20 - Heavy duty unsealed shoulder 200mm thickness | Price on Application | N |
Medium/light duty asphalt concrete 50mm thickness | ||
Areas up to 5m2 | $304.00 | N |
Areas between 5m2 and up to 10m2 | $283.00 | N |
Areas between 10m2 and up to 20m2 | $253.00 | N |
Areas above 20m2 | $242.00 | N |
DGB20 - Unsealed shoulder 100mm thickness | Price on Application | N |
Footpaths: (per sqm) | ||
Standard brick or concrete pavers on a 50mm thickness on a granula sub-base | ||
Areas up to 5m2 | $335.00 | N |
Areas between 5m2 and up to 10m2 | $294.00 | N |
Areas between 10m2 and up to 20m2 | $273.00 | N |
Areas above 20m2 | $263.00 | N |
Town Centre paving on 100mm steel reinforced sub base to Town Centre specifications per m2 | ||
Areas up to 5m2 | $762.00 | N |
Areas between 5m2 and up to 10m2 | $700.00 | N |
Areas between 10m2 and up to 20m2 | $649.00 | N |
Areas above 20m2 | $597.00 | N |
Concrete footpath 100mm thick steel reinforced | ||
Areas up to 5m2 | $392.00 | N |
Areas between 5m2 and up to 10m2 | $314.00 | N |
Areas between 10m2 and up to 20m2 | $294.00 | N |
Areas above 20m2 | $263.00 | N |
Topsoil up to 150mm thickness and grass per m2 | ||
Areas 0m2 - 20m2 | $134.00 | N |
Areas above 20m2 | $129.00 | N |
Driveways: (per sqm) based on minimum of 10m2 | ||
Light duty 125mm | $392.00 | N |
Heavy duty 175mm | $469.00 | N |
Driveway pavers on 100mm concrete steel reinforced base | Price on Application | N |
Kerb and Gutter Restoration Fees (per Linear Metre)
Description | Total Fee | GST |
---|---|---|
All establishment costs associated with items such as traffic and pedestrian management, service location and Dial Before You Dig, environmental measures, temporary works to make site safe, significant earthworks or topsoil and assessing or obtaining Road Occupancy Licences will be charged at cost in addition to the nominated Fees and Charges. Applies to all works. | Price on Application | N |
Laybacks (Residential) based on minimum 5.6m (excludes saw cutting and asphalt reinstatement) | $366.00 | N |
Laybacks (Industrial) based on minimum 7m (excludes saw cutting and asphalt reinstatement) | $414.00 | N |
Kerb and gutter based on minimum 10m (excludes saw cutting and asphalt reinstatement) | $414.00 | N |
Asphalt reinstatement along length of layback (minimum 4.1 metres) | $103.00 | N |
Kerb only - concrete based on minimum 10m (excludes saw cutting and asphalt reinstatement) | $232.00 | N |
Concrete dish crossing based on minimum 10m (excludes saw cutting and asphalt reinstatement) | $397.00 | N |
Lintel for concrete pit based on 1.8m (excludes saw cutting and asphalt reinstatement) | $566.00 | N |
Kerb inlet - including pipe | $155.00 | N |
Saw cutting | Price on Application | N |
Erection of Barricades
Description | Total Fee | GST |
---|---|---|
(a) Barricades/Parra webbing erected during working hours (cost per hour) | Price on Application | N |
(b) Barricades erected outside working hours (cost per hour) | $500.00 | N |
(c) Daily charge for the hire of the following equipment: | ||
(i) Barricade Lights - each per day | $4.60 | N |
(ii) Barricades - each per day | $6.90 | N |
(iii) Standard Signs - each per day | $13.40 | N |
(iv) Star Pickets - each per day | $3.00 | N |
(v) Barrier Mesh - per metre per day | $2.40 | N |
(vi) Cones - each per day | $3.50 | N |
Directional Signs
Description | Total Fee | GST |
---|---|---|
Sign only installed | ||
Sign blade of a sign with white font on blue or brown background | $202.00 | Y |
Sign and post installed | ||
Sign blade and post consisting of a sign with white font on blue or brown background on a galvanised pole | $330.00 | Y |
Sign and powder coated post installed | ||
Sign blade and post consisting of a sign with white font on blue or brown background on a powder coated pole | $366.00 | Y |
Open Space & Sustainability
Description | Total Fee | GST |
---|---|---|
Sustainability (Miscellaneous) | ||
Security Deposit (Refundable) | $105.00 | N |
(i) Tree removal Development Application/Permit Assessment Fee for number of trees (Cl 250 EPAR 2000) | ||
1-10 trees | $145.00 | N |
11+ trees | $285.00 | N |
1-10 trees (Pensioner Discount) | $75.00 | N |
11+ trees (Pensioner Discount) | $145.00 | N |
(ii) Tree Pruning Development Application/Permit Assessment Fee for number of Trees | ||
1-10 trees | $75.00 | N |
11+ trees | $145.00 | N |
1-10 trees (Pensioner Discount) | $35.00 | N |
11+ trees (Pensioner Discount) | $75.00 | N |
(iii) Pre-DA/Permit site inspection of trees and vegetation | ||
1-10 trees | $75.00 | N |
11+ trees | $145.00 | N |
1-10 trees | $35.00 | N |
11+ trees | $75.00 | N |
Tree Planting | ||
Tree planted on public land to offset loss on private land (per Tree, no GST) | $375.00 | N |
Replacement tree when required due to construction, vehicular crossing or other reason (per Tree, no GST) | $375.00 | N |
Private Works, Section 67 Local Govt. Act, 1993
- Council will undertake private works on the basis that all costs, including the recovery of labour (see below) and plant are covered, plus a 15% margin.
- The person requesting the work is to be informed in writing beforehand that the quotation is given based on current costs and therefore the price stated therein may be subject to adjustment related to the actual costs applicable at the date of execution of the work.
- Labour Costs and Overheads to be calculated as follows:
(Wage Rate x No. of Hours Work) + 30% Wage On-Costs + 15% Margin + 10% GST
Note: Excludes any Plant usage costs. - Special Note: Council reserves the right to fix fees for special projects where such are not necessarily included in the above.
- Public authorities will be required to reimburse Council in full for fees provided above for Council's costs incurred in dealing with the application.
- All proposed works to be assessed by Infrastructure Services Officer and are only available in conjunction with closely associated works undertaken by Council