Pre Development Application Meetings

DescriptionTotal FeeGST
(i) Dwellings, Dual Occupancy, Secondary Dwellings and two lot subdivisions (per meeting) Maximum Fee Payable $516.50 Y
(ii) Other minor development (per meeting) Maximum Fee Payable $516.50 Y
(iii) Major Development (per meeting) Maximum Fee Payable $1,291.25 Y
Unregistered Land - Pre DA lodgement advice (including site inspection) for unregistered land Development Applications) Maximum Fee Payable $516.00 Y
Pre DA lodgement advice (including site inspection) for unregistered land Development Applications)
Design Advisory Group - Development requiring consideration by Council's Design Advisory Group (in accordance with relevant terms of reference) Maximum Fee Payable $2,066 Y

Development Applications (Items 2.1, 2.3 & 2.7 Schedule 4 EPAR 2021)

The fees charged for development and related applications are up to the maximum fees prescribed under Schedule 4 of the Environment Planning and Assessment Regulation 2021.

Notes:

Note: If two or more fees are applicable to a single development application (such as to subdivide land and erect a building on one or more lots created by the subdivision) the maximum fee payable for the development is the sum of those fees.

Note: In determining the development of the erection of a building, the carrying out of work, or demolition of a building or work, Council must make its determination to a genuine estimate.

Note: For advice regarding the refund of applicable fees, please refer to the "Refunds" section.

Development Applications - Subdivision (Items 2.4, 2.5 & 2.6 Schedule 4 EPAR 2021)

The fees charged for development and related applications are up to the maximum fees prescribed under Schedule 4 of the Environment Planning and Assessment Regulation 2021.

Notes:

Note: If two or more fees are applicable to a single development application (such as to subdivide land and erect a building on one or more lots created by the subdivision) the maximum fee payable for the development is the sum of those fees.

Note: In determining the development of the erection of a building, the carrying out of work, or demolition of a building or work, Council must make its determination to a genuine estimate.

Note: For advice regarding the refund of applicable fees, please refer to the "Refunds" section.

Development Applications - Advertising Signage (Item 2.2 Schedule 4 EPAR 2021)

The fees charged for development and related applications are up to the maximum fees prescribed under Schedule 4 of the Environment Planning and Assessment Regulation 2021.

Notes:

Note: If two or more fees are applicable to a single development application (such as to subdivide land and erect a building on one or more lots created by the subdivision) the maximum fee payable for the development is the sum of those fees.

Note: In determining the development of the erection of a building, the carrying out of work, or demolition of a building or work, Council must make its determination to a genuine estimate.

Note: For advice regarding the refund of applicable fees, please refer to the "Refunds" section.

Development Applications - Modifications (Items 4.1, 4.2, 4.3, 4.4 & 4.5 Schedule 4 EPAR 2021)

The fees charged for development and related applications are up to the maximum fees prescribed under Schedule 4 of the Environment Planning and Assessment Regulation 2021.

Modifications Notes:

Note: For advice regarding the refund of application fees, please refer to the "Refunds" section. .

Request for Review of Determination (Items 7.1, 7.2, 7.3 & 7.4 Schedule 4 EPAR 2021)

The fees charged for development and related applications are up to the maximum fees prescribed under
Schedule 4 of the Environment Planning and Assessment Regulation 2021.

Notes:

Note: For advice regarding the refund of applicable fees, please refer to the "Refunds” section.

Other Application Fees

(i) Integrated development (Item 3.1 Schedule 4 EPAR 2021)
(ii) Concurrence development (Item 3.2 Schedule 4 EPAR 2021)
(iii) Additional fee for designated development (Item 3.3 Schedule 4 EPAR 2021)
(iv) Giving of notice for designated development (Item 3.5 Schedule 4 EPAR 2021)
(v) Giving of notice for nominated integrated development, threatened species development or Class 1 aquaculture development (Item 3.6 Schedule 4 EPAR 2021)
(vi) Giving of notice for prohibited development (Item 3.7 Schedule 4 EPAR 2021)
(vii) Giving of notice for other development for which a community participation plan requires notice to be given (Item 3.8 Schedule 4 EPAR 2021)

Other Public Notification/Advertising for Development and Related Applications

DescriptionTotal FeeGST
Public notification $304.00 N
DA Notification Sign (placed on Development Sites) $44.00 N

 Archiving Fees (per Application Lodgement)

DescriptionTotal Fee   GST
(i) Up to project value $100,000 $38.00 N
(ii) Up to project value $500,000 $70.50 N
(iii) Up to project value $1,000,000 $113.00 N
(iv) Over project value $1,000,000 $150.00 N

Activity Applications

DescriptionTotal FeeGST
Activity Application for Community Land (Section 68 LGA 1993) $379.00 N

Other advice

DescriptionTotal FeeGST
Research and Interpretation advice (up to 2 hours) $272.00 Y
Additional Hours $113.00 Y

Refunds

DescriptionTotal FeeGST
(i) Applications
(a) During assessment (refunded fee to be based on cost of work undertaken) Based on cost of work undertaken to date N
(b) If application refused or report prepared No refund N
 
(ii) Vegetation Management
(a) Before assessment $28.00 N
(b) During assessment and/or if application refused No refund N

 Building Works (PCA & Certification Services)

DescriptionTotal FeeGST
(i)  Construction Certificate
(a) General (Where estimated cost of development)
< $5,000 $310.00 + 0.5% of cost + GST Y
> $5,000 but < $100,000 $410.00 + 0.5% of cost + GST Y
> $100,000 but < $250,000 $810 + 0.2% of amt > $100,000 + GST Y
> $250,000 but < $2 Million $1,220.00 + 0.1% of amt > $250,000 + GST Y
> $2 Million (may apply to total cost for multiple buildings/Ccs for the same development) Fee by quote Y
Note: Cost referred to is deemed to be the contract price or if there is no contract price, the cost as determined by the consent authority.
 
(b) Pre-Construction Certificate Meetings
Fee $144.00 Y
 
(c) Application for amendment to Construction Certificate Plans
Class 1 & 10 $99.50 Y
Class 2 – 9 50% of original CC fee + GST Y
 
(d) Construction Certificate (Private Assessors engaged by Council)
Fee Contractors Fee + $100.00 Admin Charge Y
 
(e)  Building Code of Australia - Alternative Solutions
Building Class
Class 10 buildings $245.00 Y
Class 1a buildings/dwelling $373.00 Y
Class 1b, 2 to 9 buildings – Minimum fee, with additional fee to be negotiated on a case by case basis and subject to a peer review being required $745.00 Y
Note: This fee is in addition to normal Construction Certificate/PCA fees
Note: Performance Solutions required to be referred to NSW Fire & Rescue will require a separate fee to be paid to NSW Fire and Rescue
 
(f) Civil Engineering - Construction Certificate/Design Assessment
These fees may be charged in addition to building work Construction Certificate fees for larger projects
 
Small development
1st submission each $612.00 Y
2nd submission each $230.00 Y
3rd submission and other (per hour – assessment) $166.00 Y
 
Medium development
1st submission each $1,280.00 Y
2nd submission each $506.00 Y
3rd submission and other  (per hour - assessment) $166.00 Y
 
Major Development
Note: This fee is in addition to normal Construction Certificate/PCA fees
1st submission each $2,770.00 Y
2nd submission each $1,385.00 Y
3rd submission and other (per hour – assessment) $166.00 Y
 
(g)  Engineering Inspections - Design Verification
Note: Separate to PCA Critical Stage Inspections
(i) Small development (Dual Occupancies and single unit commercial and industrial developments & buildings and/or 2 lots) $597.00 Y
(ii) Medium development (Multi unit commercial and industrial developments to 5 units or, 3-5 lots) $1,545.00 Y
(iii) Major Development (Greater than 5 commercial and industrial units or more than 5 lots) $6,120.00 Y
 
(ii) Request to issue a Compliance Certificate under Division 6.5 of the EPAA, 1979
(a) Issue of a Compliance Certificate for critical stage inspection (in addition to inspection fee) $304.00 Y
(b) Issue of a Compliance Certificate for other matters – by quote $277.00 Y
(c) Additional copies of Compliance Certificates $73.50 Y
 
(iii)  Complying Development Certificates
(a) Dwelling House Cost
< $200,000 $1,650.00 Y
$200,001 to $500,000 $2,025.00 Y
> $500,000 $2,400.00 Y
 
(b) Bed & Breakfast Accommodation
Complying Development Certificate Fee $735.00 Y
 
(c) Change of Building Use
Complying Development Certificate Fee $735.00 Y
 
(d) Dwelling Alterations, Additions, Carports and Garages
< $50,000 $735.00 Y
$50,001 to $100,000 $947.00 Y
$100,001 to $200,000 $1,335.00 Y
> $200,000 $1,495.00 Y
 
(e) Sheds in Rural Zones
Complying Development Certificate Fee $735.00 Y
 
(f) Swimming Pools / Spas
Complying Development Certificate Fee $735.00 Y
 
(g) Minor Structures , Pergolas etc.
Complying Development Certificate Fee $575.00 Y
 
(h) Subdivision
Complying Development Certificate Fee $671.00 Y
 
(i) Any other development not specified
Complying Development Certificate Fee Fee by quote Y
 
(j) Modification of CDC
(a) Minor Changes $250.00 Y
(b) Major Changes 50% of Original CDC Fee + GST Y
 
(iv)  Occupation Certificates
(a) Dwellings (per sole occupancy dwelling), dwelling additions and outbuildings/swimming pools (where not included in an inspection package) $352.00 Y
(b) Class 2-9 minor development (including change of use) < $100,000 $368.00 Y
(c)Class 2-9 major development > $100,000 $506.00 Y
(d) Part Occupation Certificates – applying to all development $352.00 Y
(e) NSW Fire Brigade Final Fire Safety Report – Administration $75.00 Y
NSW FB Final Safety Report Fee At Full Cost Recovery N
Note: The NSW Fire Brigade Final Safety Report Fee will be charged as part of the Occupation Certificate lo dgement fee, with the amount determined by NSWFB. Council will then invoice this amount at the time of the issue of an Occupation Certificate (this is to be paid prior to release of Occupation Certificate).
 
(v) PCA Building Inspections (Critical Stage Inspection)
(i) General
Single element i.e. frame, drainage etc. $181.00 Y
 
(ii) Building Packages (including Occupation Certificate)
(a) Class 1a dwellings, large additions, dual occupancies (per dwelling)
< $250,000 $1,225.00 Y
> $250,000 $1,495.00 Y
For Developments involving >10 dwellings/buildings inspections to be calculated on total development at rates in (V)(i)
 
(b) Carports / Pergolas / minor work
Inspection Fee $352.00 Y
 
(c) Alterations and additions
< $100,000 $671.00 Y
> $100,000 $1,035.00 Y
 
(d) Sheds in rural zones
Inspection Fee $666.00 Y
 
(e) Swimming pools and spas
Inspection Fee $666.00 Y
 
(iii) Building Package Class 2-9 (excluding Occupation Certificate)
(a) Class 2, 3 & 4 buildings (package for residential works)
1st dwelling $1,125.00 Y
2nd dwelling $543.00 Y
Each additional dwelling $373.00 Y
 
(b) Class 5-9 buildings
< $100,000 $718.00 Y
> $100,001 but < $500,000 $1,495.00 Y
> $500,001 but < $1,000,000 $2,240.00 Y
> $1,000,001 but < $2,000,000 $2,555.00 Y
> $2,000,001 but < $3,000,000 Fee by quote Y
> $3,000,001 but < $10,000,000 Fee by quote Y
> $10,000,001 Fee by quote Y
 
(iv) Miscellaneous
(a) Additional copies of certificates $69.50 Y
(b) Inspections after hours (per hour) $293.00 Y
(c) Pre Lodgement assessment CC or CDU Fee by quote Y
(d) Change of Principal Certifying Authority to Council – Council will quote on the service required where a change of PCA is accepted by Council (or required to be accepted by Council) Fee by quote Y
For example, a house may be half completed. If asked to accept the role of Principal Certifying Authority, Council will quote on remaining critical stage inspections and occupation certificate, as well as time to become familiar with the project (BCA assessment of the project & general compliance with the consent). A base fee will be a minimum of the cost of a CC for such development + inspections required + a $100 administration fee will apply (OC's in this instance are charged separately).
 
(e) Appoint Council as Principal Certifying Authority (PCA) where Council was not appointed to assess and issue the Construction Certificate (CC) or Complying Development Certificate (CDC) – Council will quote on the service required to familiarise with the CC or CDC issued; this is akin to a full assessment of the CC/CDC Fee by quote Y
Should the PCA role be accepted by Council (or be required to be accepted by Council). Council Certifiers will quote on the, critical stage inspections and occupation certificate, as well as time to become familiar with the project (BCA assessment of the project & general compliance with the consent). A base fee will be a minimum of the cost of a CC for such development + inspections required + a $100 administration fee will apply (OC's in this instance are charged separately).
 

 Subdivision Work (PCA and Certification Services)

DescriptionTotal FeeGST
(i) Subdivision works Certificate
(a) General
No New Public Road, no ROW, but with other Work (incl. Parks) $453.00 Y
No New Public Road, with ROW and Other Work $590.00 + $8.00/metre of ROW Y
New Public Road and Other Works $675.00 + $11.00/metre of new road Y
Bulk Earthworks Only $634.00 Y
Water Management Facility $300.00 + 0.5% cost Y
 
(b) Modification of Subdivision Works 
Minor/per item or sheet $193.00 Y
Major/Multiple issues 50% of original construction fee Y
 
(c) Pre-Subdivision Works Certificate Review of Requirements
Construction Certificate Fee $181.00 Y
 
(ii) Compliance Certificate
(a) Engineering Design
Small subdivision (< 5 lots) $585.00 Y
Medium subdivision (5 to 40 lots) $1,440.00 Y
Large subdivision (> 40 lots) $5,850.00 Y
 
(b) Landscape Plan Assessment
Small subdivision (area to landscape less than 5,000m2) $629.00 Y
Large subdivision (area to landscape between 5,000m2 and 10,000m2) $1,335.00 Y
Major subdivision (area to landscape greater than 10,000m2) $2,025.00 Y
 
(c) Landscape Inspections
Subdivision into two lots $671.00 Y
Subdivision into more than two lots $1,385.00 Y
 
(iii) Subdivision Work Inspections (PCA Inspections)
Note: Items a,b, c and d are charged separately except when purchased with the roads and drainage [see item (e) below]
(a) Sediment and erosion control plans $283.00 N
(b) Traffic Management Plans (TMP) $283.00 N
(c) Common drainage line (CDL) $340.89 + $3.30 per lineal metre of pipe N
(d) All other drainage except roads $841.89 + $8.06 per lineal metre of pipe N
(e) Road and drainage (per road carriageway) $929.7 + $29.54 per lineal metre of road N
(f) Right of Carriageway $464.85 + $8.06 per lineal metre of road N
(g) On site detention $187.00 N
(h) Miscellaneous (hourly rate) $166.00 N
(i) Reinspection (hourly rate) $166.00 N
(j) Contributions Planning Reinspection Fee $620.00 N
 
(iv)  Subdivision Certificate
(a) Consolidating allotments and boundary adjustments (Including Exempt Subdivisions) $543.00 N
(b) Where Council is the PCA and has inspected subdivision works $1,110.47 + $149.76 per additional lot N
(c) Where Council is not the PCA, but engaged by the PCA to do the inspections $774.75 + $123.96 per additional lot N
(d) Where no CC was issued and no subdivision work required $769.58 + $147.72 per additional lot N
(e) Resigning /Endorsement of a certificate, instrument or plan including where original has been amended, lost or destroyed $299.00 N
(f) Strata certificates $769.58 + $147.72 per additional lot N
(g) New and amended 88B/88E Instrument Assessment (including deletion of restrictions/easements) $388.00 + $77.00 per additional lot (+ PEXA lodgement fees see below) N
(h) Documents note in (g) requiring lodgement via PEXA (NB additional disbursements will be at the applicants cost) Positive Covenants/Restrictions = $250.00 +GST
Easements/transfers/other= $500 +GST 
Min. Fee (incl. GST): $275.00
N

Long Service Levy

DescriptionTotal FeeGST
Long service levy to be paid to the Long Service Payments Corporation for all projects costing $250,000 or more 0.25% of Cost N
Note: No levy is payable on work costing less than $250,000

 Public Road Works

DescriptionTotal FeeGST
Roadworks – For minor works only (For major works use subdivision fees) $495.00 N

Other Certificates and Fees

DescriptionTotal FeeGST
(i) Planning Certificate
(a) Full (s.10.7 EPAA 1979) $168.00 N
(b) Partial (s.10.7 EPAA 1979) $67.00 N
 
(ii) Urgency Fee
Urgency Fee (24h Response) $81.50 N
 
(iii) Copy of Local Environment Plan (Written Instrument)
Local Environment Plan Fee $39.00 N
 
(iv) Building Information Certificate
(a) Section 149B Building Certificate Class 1 or Class 10
Section 149B Building Certificate $250.00 N
(b) Other classes
(i) Not exceeding 200 sqm floor area $250.00 N
(ii) 200 sqm – 2,000 sqm floor area $250.00 + $0.50 per sqm for area exceeding 200 sqm N
(iii) Exceeding 2,000 sqm floor area $1,165.00 + 7.5c per sqm for area exceeding 2,000 sqm N
(iv) Where no floor area applies $250.00 N
 
(c) Additional fee if more than one inspection needed
Additional Fee $90.00 N
(d) Urgency fee (additional)
Urgency Fee $73.50 N
(e) Building Information Certificate copy 
Certificate Copy Fee $13.00 N
(f) Building Information Certificate amended
Certificate Fee $62.00 N
(g) Certified copy of a document
Certified Copy Fee $53.00 N
(h) Administration fee for cancellation of building certificate
Administration Fee $25.00 N
 
(v) Outstanding Notice Certificate (s.735A LGA 1993 & Part 9 EPAA 1979)
Outstanding Notice Certificate Fee $120.00 N
 
(vi) Certificate Under Section 88G(3) of The Conveyancing Act, 1919 (Certificate as prescribed under cl.40 of The Conveyancing Act (General) Regulation, 1988)
(a) No inspection required $30.00 N
(b) Inspection required $90.00 N

Notes:

Note: An additional fee determined as shown below, may be charged for an application for a building certificate in relation to a building where the applicant for the certificate, or the person on whose behalf the application is made, is the person who erected the building or on whose behalf the building was erected and any of the following circumstances apply:

(a) Where a development consent, complying development certificate or construction certificate was required for the erection of the building and no such consent or certificate was obtained,

(b) Where a penalty notice has been issued for an offence under section 4.2 of the Environmental Planning and Assessment Act (the Act) in relation to the erection of the building and the person to whom it was issued has paid the penalty required by the penalty notice in respect of the alleged offence (or if the person has not paid the penalty and has not elected to have the matter dealt with by a court, enforcement action has been taken against the person under Division 4 of Part 4 of the Fines Act 1996),

(c) Where order No 2, 12, 13, 15, 18 or 19 in the Environmental Planning and Assessment Act 1979 has been given in relation to the building unless the order has been revoked on appeal,

(d) Where a person has been found guilty of an offence under the Act in relation to the erection of the building,

(e) Where the court has made a finding that the building was erected in contravention of a provision of the Act.

The additional fee payable is the total of the following amounts:

(a) The amount of the maximum fee that would be payable if the application were an application for development consent, or a complying development certificate (if appropriate), authorising the erection or alteration of any part of the building to which the application relates that has been erected or altered in contravention of the Act in the period of 24 months immediately preceding the date of the application

(b) The amount of the maximum fee that would be payable if the application were an application to the council for a construction certificate relating to the erection or alteration of any part of the building to which the application relates that has been erected or altered in contravention of the Act in the period of 24 months immediately preceding the date of the application

Resited Dwellings

DescriptionTotal FeeGST
(i) Inspection fee $532.00 N
(ii) Plus – per km (travelling both ways) $2.90 N

Approvals Issued Under Section 68 of the LGA, 1993

DescriptionTotal FeeGST
(i) Initial Inspection $283.00 N
(ii) Where inspection is requested and is not ready for inspection $118.00 N
(iii) Reinspection $134.00 N
Note: Where Public Notification is required – refer to Public Notification/Advertising section of Fees & Charges
 
(i) Amusement Device Approval
(a)1-3 Devices/rides $99.50 N
(b)4- 8 devices/ rides $193.00 N
(c) 9-15 devices/rides $372.00 N
(d) >15 devices rides $372.00 + $30.00 per device/ride in excess of 15 N

Caravans approvals

DescriptionTotal FeeGST
(i) Special/site specific approval (caravan/ m-home) (LG Act Sec68 Table 1 Part A1) $99.50 N
(ii) Inspection fee $129.00 N
(iii) Reinspection $144.00 N
(iv) Certificate of completion $357.00 N
(v) Private premises approval-caravan/portable/manufactured home $105.00 N
(vi) Caravan /Manufactured Home Park – Approval to Operate (per site/van) $6.60 N
(vii) Re-issue of approval/ change of ownership $107.00 N

Install a domestic oil / solid fuel heater - (Section 68 - Table 1, Part F.4)

DescriptionTotal FeeGST
Application to Install a domestic oil or solid fuel heater $272.00 N
Note: Notification may be required - refer to Camden LAP

Fire Safety Certificates

DescriptionTotal FeeGST
(a) Lodgement of Annual Fire Safety Statements $91.50 Y
(b) Lodgement of an Annual Fire Safety Statements for a building with "Alternative" solutions (BCA) $144.00 Y
(c) Reassessment of unsatisfactory Annual Fire Safety Statements $91.50 Y
(d) Fire Safety Assessment & Inspection Service – per hour (min 1 hour) $155.00 Y

Miscellaneous Fees

DescriptionTotal FeeGST
(i) Search for building records over 5 years: (per hour)(Minimum Charge of 1 hour)
Search Fee $85.50 N
 
(ii) Charge for Staff members services: (per hour)
Staff Services Fee $181.00 Y
Note: Staff costs include on-costs, but excludes plant & materials costs.
 
(iii) Solicitor's enquiries and like research of Council Files and records: (per hour)( Minimum Charge of 1 hour)
Solicitor Enquiry Fee $166.00 N
 
(iv) Copy of tech study/reports - Geotech (Written Statement)
Copy of tech study/reports $80.50 N
 
(v) Enquiries and advice requiring investigation and written response: (per hour)
(a) Standard (minimum charge of 1 hour) $166.00 N
(b) Complex (minimum charge of 1 hour) $166.00 N
 
(viii) Variation of 'Restriction as to User'
Variation Fee $187.00 N
 
(ix) Search of Council records relating to contaminated land:(per hour)
Search Fee $161.00 N

Records, Documents and Copying

DescriptionTotal FeeGST
Description Total Fee GST
(i) Documents under 15 A4 pages
Fee $31.00 N
(ii) Documents over 15  A4 pages
Fee $43.00 N
(iii) Policies
Fee $32.50 N
(iv) Council documents only - per page
Fee $2.50 N
(v)  Property plot
Fee $10.40 N
(vi) Environmental Impact Statements
Fee $41.00 N
 
(vii) Certificate Handling Fee - Registration of Private Certifier - Complying Development Certificates, Construction Certificates, Compliance Certificate, Occupation Certificates, Subdivision Certificates (per lodgement)
Certificate Handling Fee $36.00 N
 
(viii) Engineering Specifications
(a) Design $83.50 N
(b) Construction $83.50 N

Digital Products

DescriptionTotal FeeGST
(a) Data extraction fee – labour component (per hour, minimum 1 hour) $166.00 N
(b) Cadastre data – per parcel (including lot, DP number, road boundary & road name) $13.60 N

Refundable Bonds & Administration Fees

DescriptionTotal FeeGST
(i) Bond Administration Fee - Lodgement
(a) Cash / Cheque Bond or Deposit $193.00 N
(b) Bank Guarantee $368.00 N
(c) Rolling Bond Monitoring Fee per hour (minimum 1 hour) $166.00 N
Note – Payable at each request to modify, transfer or refund security and/or secured items within the rolling bond.
Note – All bonds permitted by Council or required by a consent will require the above processing/administration fee.
(d) Bond refunds (per bond) $325.00 N
Note – Applicable to all other bonds lodged after 1 August 2019 (Not applicable for release of Damaged Bonds)
 
(ii) Resited Dwellings Bond - Refundable
Bond $1,385.00 N
 
(iii) Bond Items
(a) Trees/Lot (Rate per tree) $352.00 N
(b) Footpath Construction (per lineal metre) $139.00 N
(c) Filming – Damage Security $1,385.00 N
(d) Public Road Events – Damage Security $2,875.00 N
Note: GST applies to any portion of the bond retained.

Map Production

DescriptionTotal FeeGST
i) Map Production
(a) Labour component – per hour, minimum 1 hour $166.00 N
(b) Map production fee – consumables component $39.00 N
Note: Map production incurs a labour and consumables component
 
ii) Map Printing & Other Charges
(a) Basic Map within LGA – A4 size per sheet $7.40 N
(b) Basic Map within LGA – A3 size per sheet $15.20 N
(c) Basic Map within LGA – A2 size per sheet $45.00 N
(d) Basic Map within LGA – A1 size per sheet $67.50 N
(e) Basic Map within LGA – A0 size per sheet $88.50 N
(f) Aerial Photography – A4 size per sheet $15.20 N
(g) Aerial Photography – A3 size per sheet $31.00 N
(h) Aerial Photography – A2 size per sheet $59.00 N
(i) Aerial Photography – A1 size per sheet $119.00 N
(j) Aerial Photography – A0 size per sheet $181.00 N
(k) Property search $41.00 N